Epstein File Explorer
Overview
Documents
Network
Analysis
About
Overview
Documents
Search
Collections
Network
Entities
Graph
Map
Analysis
Analytics
Compare
About
Updates
MCP
About & Legal
Back to data-set-11
EFTA02444456.pdf
PDF
7.1 MB
24 pages
Extracted Chars
22,480
Entities
20
Relationships
18
Loading extracted text...
Mentioned Entities
20
10 MW Gasification System
Property
2 mentions
Innviron
Organization
Company
2 mentions
Trinidad
Location
1 mention
Georgia, USA
Location
1 mention
RCRA
Organization
GovernmentAgency
1 mention
Radian International LLC
Organization
Company
1 mention
D. Maxwell
Person
Academic
1 mention
D. Orr
Person
Academic
1 mention
B. Wetherhold
Person
Academic
1 mention
Innviron Personnel
Person
Academic
1 mention
Local Base
Organization
GovernmentAgency
1 mention
Local Utility Company
Organization
Company
1 mention
Gasification Plant Facility
Property
1 mention
Epstein Financial Trust
Organization
Trust
1 mention
Sorting and Separation Facility
Property
1 mention
BOP Engineering
Organization
Company
1 mention
Integra Energy Consulting
Organization
Company
1 mention
U.S. Department of Energy
Organization
GovernmentAgency
1 mention
Nassau County
Location
1 mention
Government
Organization
GovernmentAgency
1 mention
Relationships
18
Innviron Personnel
→
employment
→
Innviron
"lnnviron personnel assisted in development of RCRA regulations"
Innviron
→
event
→
Georgia, USA
"Currently designing and permitting the first US commercial Waste Gasification Facility in Georgia, USA"
Innviron
→
event
→
Trinidad
"Beginning construction on Gasification Facility in Trinidad in November 2009"
Innviron
→
financial
→
Sorting and Separation Facility
"FIGURE 3. SORTING AND SEPERATION FACILITY LAYOUT INNVIRtN"
Innviron
→
financial
→
10 MW Gasification System
"Innviron 250 1.12 $25 192 $130.21 Gasifier"
Innviron
→
financial
→
10 MW Gasification System
"PRELIMINARY COST ESTIMATE Description 10 MW System 30 MW System Design and Permitting $1,000,000 $1,000,000"
Innviron Personnel
→
power
→
RCRA
"lnnviron personnel assisted in development of RCRA regulations"
Innviron
→
event
→
Nassau County
"Design, Construction, and Operation of Solid Waste Facilities in the USA, Argentina, Ecuador, the Bahamas, Oman"
Epstein Financial Trust
→
financial
→
Gasification Plant Facility
"EFTA_R1_01521325 ... Total Construction Cost $22,433,000"
Integra Energy Consulting
→
document
→
Innviron
"Source: Integra Energy Consulting"
BOP Engineering
→
document
→
Innviron
"Source BOP Engineering"
Local Utility Company
→
financial
→
Gasification Plant Facility
"Assistance to Obtain Power Buy Back Agreement with the Local Utility Company"
Government
→
financial
→
Gasification Plant Facility
"Government Stimulus Money and Subsidies"
Government
→
power
→
Gasification Plant Facility
"Support in Permitting the Facility"
Radian International LLC
→
employment
→
U.S. Department of Energy
"prepared for US Department of Energy by Radian International LLC, 30 Mar. 2000"
B. Wetherhold
→
employment
→
Radian International LLC
"Wetherhold, B., Orr, D., and Maxwell, D., A Comparison of Gasification and Incineration of Hazardous Wastes prepared for US Department of Energy by Ra"
D. Orr
→
employment
→
Radian International LLC
"Wetherhold, B., Orr, D., and Maxwell, D., A Comparison of Gasification and Incineration of Hazardous Wastes prepared for US Department of Energy by Ra"
D. Maxwell
→
employment
→
Radian International LLC
"Wetherhold, B., Orr, D., and Maxwell, D., A Comparison of Gasification and Incineration of Hazardous Wastes prepared for US Department of Energy by Ra"
EFTA02444456.pdf | Epstein File Explorer